Working method
How we run
a building site
From the first site visit to the handover, with a single point of contact.
How we work
A single point of contact
As well as running the company, surveyor Mario Scargiali personally oversees the work on site, from the first site visit to the handover.
On site, our own crews do the work. Alongside your designer, or as General Contractor with our trusted technical team, we follow every stage of the work, including permits and, on listed buildings, the dialogue with the Soprintendenza, the Italian heritage authority.
- Contact
- Surveyor Mario Scargiali
- Crews
- In-house, 15 people
- Quality
- UNI EN ISO 9001:2015
- Area
- Trasimeno, Valdichiana, Umbria and Tuscany
The stages
From the site visit to the handover
Five steps, overseen by the owner in person. The photos come from our own building sites.
Site visit
With surveyor Mario Scargiali
Surveyor Mario Scargiali visits the property, assesses its structure and condition and listens to what you need.

The Vigna Nuova farmhouse before the works Estimate
Before the site opens
Work, materials and timing set out item by item, before the site opens.

The façade of Ca’ Litardo in 2018, before the works Design and permits
With your designer or as General Contractor
We work alongside your designer or act as General Contractor with our own trusted technical team. On listed buildings we handle the dialogue with the Soprintendenza.

The Monastery of the Poor Clares, a listed building Construction
Our own crews, a single point of contact
Our own crews and a single point of contact from start to finish. Traditional techniques and local materials, such as travertine and Pietra Serena, alongside contemporary solutions.

The Vigna Nuova building site Handover
Full documentation
Completion of the works and full documentation of the project.

La Vigna Nuova today
An example
Podere La Vigna Nuova
A stone farmhouse in Città della Pieve, renovated between 2013 and 2017. Below, the building site and, further down, the farmhouse before and after from the same side.



Techniques and materials
Materials of the area
On site we use traditional techniques and local materials, such as travertine and Pietra Serena, alongside contemporary solutions.
Techniques and materials comply with national and European regulations. On listed buildings every choice is agreed with the Soprintendenza.
Regulations
Quality and safety
We pay close attention to regulations, above all those on safety.
- UNI EN ISO 9001:2015Quality management system, certified by Apave Certification Italia for the renovation of buildings.
- TrainingOur employees have attended numerous professional qualification courses.
- Cassa Edile Awards 2025Recognition from the Cassa Edile in the Sprint and Fair Play categories.